cn
Three measures to improve the waterproof performance of external wall insulation materials
2021-04-08       Source:尤特森保溫材料

In recent years, with the development of national economy and construction industry, people put forward new requirements for the comfort and safety of buildings, especially external wall heat preservation materials, both heat preservation and energy saving, but also waterproof hate water.  The waterproof function of exterior wall insulation material is mainly realized through three steps.  

 建筑外墻保溫材料

Main measures to ensure the external insulation and waterproof function of external walls:  

 

First, step by step grading, releasing stress and preventing cracks is the correct technical route of external wall insulation and waterproof  

 

External thermal insulation to prevent cracks is the basis of the success of external thermal insulation waterproof technology.  The following principles should be considered to prevent cracks in the external insulation:  

 

The thermal insulation effect of external insulation meets the requirements of all structures in the same temperature environment.  Each structural layer of external thermal insulation material system should meet the unified principle of allowable deformation, induced deformation and limited deformation;  The external insulation structure should meet the flexible stress release principle, match the elastic modulus change index of each layer, and the flexible deformation of the outer layer is larger than that of the inner layer.  Uniform and dispersed soft steel bars (metal quadrilateral welding network should meet the rustproof performance, glass fiber cloth alkali strength retention rate) should meet the service life requirements.  

 

The thermal stress generated by the rapidly changing temperature difference is concentrated on the outer surface of the external insulation.  The principle of releasing temperature stress and deformation energy should be followed to solve external thermal insulation crack.  The crack prevention technology of layer by layer gradual change and flexible stress release can effectively control the surface crack of insulation layer.  The main points of structural design of layer-by-layer gradual change, flexible stress release and anti-crack technology are as follows:  

 

The performance and elastic modulus of adjacent structural layers of insulation system match and gradually change.  Anti-crack mortar should ensure certain flexibility in order to release deformation stress.  At the same time, the anti-crack protective layer adopts steel wire mesh to change the direction of stress transmission and prevent the possibility of various deformation stress concentration.  After the coating is completed, the ideal pattern should be from anti-crack mortar layer to putty layer to coating flexibility and deformation ability gradually increased;  When facing ceramic tile, should use flexible adhesive and juncture adhesive.  

 

In the application of exterior wall thermal insulation technology, adopting the principle of "release", that is, adopting flexible gradual change and releasing stress layer by layer, is the correct method to prevent exterior wall thermal insulation from cracking and ensure waterproof function.  

 外墻保溫材料

Two, solve the external wall thermal bridge problem  

Thermal bridge refers to the part of the envelope structure, including metal, reinforced concrete beams, columns, balconies, sunshades, lines, etc.  Under the action of indoor and outdoor temperature difference, heat transfer is intensive and inner surface temperature is low.  These parts form heat transfer Bridges, so they are called thermal Bridges.  These thermal Bridges are usually ignored in the absence of insulation and the temperature-induced deformation is different from that of walls with external insulation.  After a certain time of deformation and destruction, will cause these parts without thermal insulation and external thermal insulation wall junction damage cracks.  The basic way to solve the thermal bridge is to break the bridge, that is, the external insulation layer must completely cover all the external surface, so that the insulation layer is closed.  For example, parapets raised from the roof should have external insulation on the front, back and top.  

 

Three, the construction measures of the hole of the adhesive layer  

In order to prevent rain, snow and water from flowing into the insulation layer along the cavity of the bonding layer, the construction of the bonding insulation material in Chongqing must adopt the point box bonding method.  All sides of the insulation board should be coated with paste mortar, the width is not less than 5 cm, not more than 1 cm from the outside of the board, so that the paste mortar forms a closed frame, the frame should be coated with five paste mortar points.  This not only ensures the paste area, but also compacts the paste mortar to squeeze the board edge, there is no gap between adjacent boards, blocked the seepage route.  

农村女妓女野外bbw| 久久久久亚洲av成人无码网站| 丰满人妻跪趴高撅肥臀| 亚洲樱花大片| 亚洲成av人在线视| 成熟丰满妇女xxxxxxx| 99久久精品国产一区二区三区| 国产精品va在线观看无码| 中文无码AV一区二区三区| 精品无码久久久久久久久久| 成年裸男自慰gay网站| 国产成年无码av片在线| 亚洲av永久中文无码精品综合| 丰满少妇被猛烈高清播放| 中国熟妇浓毛hdsex| 天天躁夜夜躁天干天干2020| 群体交乱之放荡娇妻a片视频| 日日碰狠狠添天天爽超碰97| chinese偷拍宾馆tube| 中文字幕在线亚洲精品| 国产深夜男女无套内射| 办公室里呻吟的丰满老师| 成年裸男自慰gay网站| 欧美裸体xxxx极品少妇| 电梯里吸乳挺进我的身体视频| 亚洲精品国产综合久久久久紧| 我趁老师睡觉摸她奶脱她内裤 | 免费sm羞辱调教视频网站| 极品丝袜乱系列全集大全目录 | 啊灬啊别停灬用力啊岳| 又粗又大又硬毛片免费看| 亚洲午夜无码毛片av久久久久久| 亚洲A∨无码男人的天堂| 免费夜色污私人影院在线观看| 午夜精品久久久久久久| 国产亚洲精品美女久久久久久| 欧美老肥婆牲交videos| 人妻巨大乳hd免费看| 国产综合在线观看| 成av人电影在线观看| 亚洲国产精品一区二区久久HS|